CPD – Webinar – From Blueprint to Reality: Preparing and Responding to Extension of Time Claims – 11 February 2019

Loading Events
  • This event has passed.

RICS is delighted to invite you to a Webinar CPD on From Blueprint to Reality: Preparing and Responding to Extension of Time Claims, which will be held on 11 February 2019.

The presentation focuses on practical analytical tools and drafting techniques for the preparation and assessment of extension of time claims. It addresses real-life considerations that go beyond the basic theory of delay analysis methods and concepts.

The topics covered are wide-ranging and address:

  • Scope definition
  • Relevance of contract terms and project history
  • Identification and use of available records and contemporaneous progress information
  • Methodology selection
  • Most commonly faced challenges and structuring of delay claims and assessments

Speaker: Yasir G. Kadhim

About the Speaker

Yasir G. Kadhim is an associate director at HKA in Abu Dhabi. He has extensive experience in forensic delay and disruption analysis and regularly provides advice to owners, contractors, and legal counsel. He comes from a background in civil engineering and contracting, holds Master’s degrees in engineering and construction law, is an accredited mediator and a member of numerous professional institutes. During his carrier, Yasir has been engaged in a diverse range of high-profile projects including landmark tourism developments, nuclear and fossil fuel power generation projects, major infrastructure works, industrial plants and oil and gas projects.

Agenda:

18:00 to 18:30 – Adobe Connect will be open for Audio Testing

18:30 to 19:30 – Presentation

19:30 to 20:00 – Q&A

 

Do not send payment via bank transfer as this form of payment is no longer acceptable for CPD events.

Please note: We are unable to reserve a place at this event unless payment is made through this secure payment portal.

The presentation will start promptly at 6:30pm. If you have not been signed in by this time (6:30pm), you will not be able to claim your 1.5 CPD hours.

 

TRN – 100002591400003

February 11 2019

Details

Date: February 11
Time: 6:00 pm - 8:00 pm
Cost: 50AED
Event Category:

Venue

via Adobe Connect link

Dubai United Arab Emirates

Organizer

CPD WEBINAR- weblink will be sent a day prior to the CPD event
Phone: 04 375 5807/ 04 375 5806
Email: